Mini™ and LT.™ Instructions - view PDF 

Jr.™ and Pro™ Instructions

Simple Set Up

Click on any image to see a larger version of it.

Step 1

Lay out ground cloth and secure using stakes provided

Layou Groundcloth Secure with stakes

Step 2

Roll out SuperScreen frame. The frame is deployed with base towards audience and front surface of frame face-up

Roll out Superscreen Frame

Step 3

Blower is attached to screen using filler tube provided. Blower uses constant velocity fan using 15 a, 110 V AC. Just plug in and turn on.

Blower filler tube Contant velocity fan

step 4

Once frame is inflated, begin to attach screen using clip system provided. Begin at the top of the screen and work around to the base.

Attach Screen Using Clip system

Step 5

Secure nine tie-down straps to screen frame using closed-loop-hooks and D-rings. Loosely secure opposite end of tie-down straps to secure ground locations using stakes provided or other suitable method.

Secure tie down straps

Step 6

After tie-down straps are attached, you’re ready to move SuperScreen into position. Crew members tilt screen to vertical position and slide base into place.

Move in to position

Step 7

Once screen is in final position, cinch tie-down straps to completely secure screen.

Cinch tie-down straps

SuperScreen – set and ready to go!

SuperScreen set Ready to Go!
 
military rent buy link to index.html link to contact page